A competent person has to inspect a construction scaffold before it’s first used, then at least every seven days, and again after anything that could affect its safety, such as high winds or a significant alteration. The written report is the legal record. The tag hanging on the ladder isn’t. The detail below is what catches people out.

When an inspection is required

The rule sits in regulation 12 of the Work at Height Regulations 2005. For a working platform used in construction, where a person could fall 2 metres or more, there are three triggers:

  • Before first use. Once it’s been put up, in its final position, and before anybody starts work on it.
  • Every seven days. It can be more often if a risk assessment says so. Seven days is the outer limit, so a scaffold checked on Monday is due by the following Monday.
  • After something happens. The regulations refer to exceptional circumstances liable to jeopardise safety. HSE gives high winds and adverse weather as examples, and it also expects a check after substantial alteration.

Scaffolds under 2 metres don’t escape altogether. They still have to be safe, and inspected where their safety depends on how they were assembled, but the formal reporting rules are tied to the 2 metre platform.

Who can do it

The law says “competent person”, which means someone whose knowledge, training and experience suit the type and complexity of the scaffold. According to HSE’s scaffolding guidance, that could be someone assessed under the Construction Industry Scaffolders Record Scheme (CISRS), or someone trained by a manufacturer or supplier for that system.

It doesn’t have to be a scaffolder in every case. HSE says a non-scaffolder such as a site manager, who has attended a scaffold inspection course and has a relevant background, may be competent to inspect a basic scaffold. The same person wouldn’t be right for a complex structure, though. If you aren’t sure whether your scaffold is basic, assume it isn’t and get it inspected by someone with the right training.

Whose job it is to arrange it

This is the biggest source of confusion on site. HSE puts the duty on the scaffold’s user or hirer. The scaffolding firm hands the job over, but that doesn’t automatically mean they’re coming back each week. Sometimes weekly inspections are part of the contract, and sometimes they aren’t.

So get it in writing at the start. On a commercial job, the principal contractor will normally have a system for it. On a small domestic job, the builder needs to say who’s doing it. And if several trades are using one scaffold, each employer still needs to be satisfied it’s safe for their people.

What the report has to say

The inspector has to prepare the report before the end of the working period in which the inspection happened, and hand it (or a copy) to whoever commissioned the inspection within 24 hours. Schedule 7 of the regulations lists what must be included:

  1. The name and address of the person the inspection was done for.
  2. The location of the equipment.
  3. A description of the equipment.
  4. The date and time of the inspection.
  5. Details of anything that could pose a risk to anyone’s health or safety.
  6. Details of any action taken as a result.
  7. Details of any further action considered necessary.
  8. The name and job title of the person writing the report.

The report must stay on site until the construction work is finished, then be kept at an office for three months. HSE also wants defects recorded even when they’ve been fixed on the spot, because repeated problems only show up if they’re written down. A loose board found every week says something about how the scaffold is being treated.

What the tag means, and what it doesn’t

HSE’s position on tags is simple: they’re not a legal requirement. A tag system is a way of showing people who are about to use the scaffold that it has been inspected and is safe, and it supplements the report. It doesn’t replace it.

Most systems work on the same idea, though the details vary between suppliers. A tag holder sits at each access point, usually with an insert showing the date of the last inspection and the date of the next. A green or “safe” insert means it has been inspected. A red or missing insert, or a “do not use” message, means stay off it. Any insert that’s out of date should be treated as no inspection at all.

Three things to remember when you see one:

  • A tag says the scaffold was fine when it was last checked. It can’t tell you someone took out a tie an hour ago.
  • Check the date, not just the colour. An old green tag is common on a site where inspections have slipped.
  • Check the tag covers the part you’re using. If there’s a restriction on a lift or a maximum load, you need to know.

Spot checks are still everyone’s business

Formal inspections don’t excuse you from using your eyes. Before you get on a scaffold each day, look for what’s changed. Are there missing guard rails or toe boards? Have boards been moved? Are ties gone, or base plates undermined by a trench? Has someone fixed sheeting to it? If so, keep off and report it, because under the regulations anyone working under another person’s control has to report defects they know could endanger others. Nobody should alter a scaffold unless they’re competent and authorised to do so.

Questions worth asking

  • Who is doing the weekly inspections, and is that in the price?
  • Where will the reports be kept, and who gets a copy?
  • Who do I ring after a storm, or if someone has altered something?
  • What happens to inspections if the job pauses? The scaffold must be checked before use again.

If you’d like us to explain how inspections would work on your project, just ask.

Free, no obligation

Get a scaffolding quote

Tell us where the job is and what you need to reach. If you would rather talk it through, call us.

01633 559152

info@scaffoldingsouthwales.co.uk

We only use your details to reply to you. See our privacy policy.

Call for a free quote: 01633 559152